PORTFOLIO: Tomah Municipal Landfill NPL Site

Work included refuse relocation, site regrading, compaction, surveying, and installation of a gas recovery system. The liner barrier system included installation of a geosynthetic clay liner, 40-mil LLDPE liner, and geocomposite drainage layer. A 30-inch frost protection cover layer was placed over the liner system. The landfill was finished with six inches of black dirt, seeded and mulched.

Location: Tomah, WI 
Owner:City of Tomah, Wl and Honeywell, Inc.
Architect:Conestoga-Rovers and Associates, Inc.