PROJECT SPOTLIGHT
The Rock River Water Reclamation District Administration Building is a 40,000 SF energy-friendly “green” building. It uses affluent water from the sanitary district to supply 30 heat pumps that regulate the heating and cooling systems.
Photo courtesy of Larson & Darby Group.
PROJECT SPOTLIGHT
We installed Waterloo Barrier sheeting, installation, and operation of four mass water removal pumps along with water treatment. This was all executed prior to release into the sewer, excavation, transportation, and disposal of soil contaminated with MGP constituents and site restoration. Project involved cooperation with the EPA, IEPA, City of Belvidere, and the Army Corp of Engineers.
PROJECT SPOTLIGHT
Realignment and reconstruction of existing I-90/I-39 interchange including 9,000 LF of mainline on Eastbound/Westbound I-90 and I-39, construction of 3 bridges including a 1,000 LF design/build flyover structure and construction of a new off-ramp for traffic detour.
CAPABILITY SPOTLIGHT
5300 Nimtz Rd
Loves Park, IL 61111
Dispatch 815-654-4720
Limestone products. Open year round.