Project
Freeport Landfill Final Cap
Location
Freeport, IL
Completed the 18 acre landfill capping project for the City of Freeport, IL. Prior to capping of the landfill perimeter work need to be completed which consisted of landfill refuse relocation inside the capping limits, grading of the surrounding site for wetland recovery and storm water detention pond excavation. Once the perimeter work was completed a grading layer was placed on the landfill footprint over 1.6M SF or liner material was installed along with soil cover layers which consisted of clay, general cover soil and topsoil which were all excavated from adjacent properties.